Digital EPDs: machine-readable formats and why PDF is not enough
EPDs are no longer read but processed. The ILCD+EPD data format, the digital product passport and direct import into building LCA tools.
Read moreEvery clca article tagged “building LCA” — 10 technical pieces covering the topic from methodology, standards interpretation and practical application angles.
10 articles
EPDs are no longer read but processed. The ILCD+EPD data format, the digital product passport and direct import into building LCA tools.
Read moreA BIM model already contains a bill of quantities. The real obstacle to connecting it to LCA is not software but material mapping.
Read moreTrying to optimise every material wastes effort. The Pareto distribution, the weight of the structure and the five decisions that actually move the number.
Read moreLevel(s) is not a certificate but a common measurement language. Its six macro-objectives, indicator structure and relationship with existing schemes.
Read moreDGNB puts life cycle assessment at the centre of the system. For a manufacturer exporting to Germany, an EPD is an entry ticket rather than an option.
Read moreBREEAM assesses materials by building element rather than one by one. The logic of Mat 01 and what it means for a manufacturer.
Read moreOptimising embodied and operational carbon separately gives the wrong answer. Cross-module trade-offs and the right place for Module D.
Read moreA building LCA is the work of assembling product EPDs. The bill of quantities, scenario definitions and setting the reference study period.
Read moreAs operational carbon falls, embodied carbon has become the dominant share. Which modules count, and which benchmarks apply?
Read moreEN 15804 produces product-level EPDs; EN 15978 assesses an entire building. How do the two complement each other?