ecoinvent v3.12: what's new, and how clca exposes the cut-off / consequential / APOS variants
ecoinvent v3.12 was released in September 2025. New datasets, updated Turkish grid mix, the three system-model variants and automatic electricity calculation in clca.
By clca Editorial TeamLast updated

ecoinvent v3.12 was released in September 2025 and contains over 21,000 activity records. More than 1,200 datasets were added or updated relative to the previous release. clca integrates with this version — no separate installation, license is managed inside the platform.
The three system models
ecoinvent ships the same data in three system models — results sometimes differ by 30%+:
- Cut-off (allocation cut-off by classification): Recycled material is delivered to its second user free of historical burden. The default for EN 15804+A2 EPDs.
- APOS (allocation at the point of substitution): Recycling burden and benefit are shared between producer and recycler.
- Consequential: Marginal-change modelling — "if this production grows by 1 ton, how does the market respond?". Used for scenario analysis.
Which model when?
- EN 15804+A2 EPD — cut-off (mandatory default)
- Academic thesis or scientific publication — APOS (more transparent allocation)
- Market-effect scenarios, "how does a 1 GW wind investment shift emissions?" — consequential
- Analysing environmental improvement priorities — APOS or consequential
Turkey-relevant updates

v3.12 updated the Turkish grid mix (TR mix) to reflect the rising share of renewables. TR-geography datasets expanded for cement and iron/steel. This brings higher accuracy to Turkish-market EPDs. clca's automatic electricity module picks TR mix, EU mix, IEA regional or a user-defined renewable mix based on your product's production geography — no manual emission-factor entry.
Custom activity creation: extend ecoinvent with local data
ecoinvent is the world's broadest database but does not contain your supplier's actual data. clca's custom activity creation starts from an ecoinvent activity and lets you update at the parameter level. Your supplier's renewable-electricity share, on-site fuel use, real wastewater treatment rate — all go into the model. The user-defined set is shared within the organisation and the source is logged.
ecoinvent access on clca
On clca, ecoinvent v3.12 ships pre-licensed; no separate installation. The smart-mapping suggestion finds the best activity in under a second based on product name + geography + technology. Switching between the three system models is a single dropdown. ecoinvent updates (e.g. when v3.13 ships) propagate automatically; legacy projects stay locked to their original version.
Tags
- ecoinvent v3.12
- ecoinvent new release
- cut-off APOS consequential
- LCI database
- ecoinvent Turkey
- automatic electricity LCA
Related reading
All articles in Data & Methods- Data & Methods
Recovery calculation: how to quantify avoided CO₂e and energy
A recovery calculation measures how much greenhouse gas and primary energy is avoided compared with the scenario in which a waste stream is not recovered. The formula, the four inputs and a worked 100-tonne PET example.
11 min read - Data & Methods
LCI databases: choosing between ecoinvent, EF and sector datasets
Choosing a background database is not a technical detail but a methodological decision that changes the result. Coverage, system models and why you must not mix.
11 min read - Data & Methods
ecoinvent activity selection: choosing the best fit on 3 criteria
Picking the right activity from ecoinvent's 21,000+ entries is a methodological decision. Geographic, technological and temporal representativeness.
10 min read - Data & Methods
Transport in LCA (A4): tkm, load factor and empty return
A4 is the transport of the product from factory gate to site, calculated as mass × distance × a per-tkm factor. Vehicle class, utilisation, empty return and the trap of volume-limited products; the EN 15804 scenario table and a worked example.
11 min read